Multimodal Processes Rescheduling: Cyclic Steady States Space Approach
Grzegorz Bocewicz,
Robert Wójcik,
Zbigniew Antoni Banaszak and
Paweł Pawlewski
Mathematical Problems in Engineering, 2013, vol. 2013, 1-24
Abstract:
The paper concerns cyclic scheduling problems arising in a Multimodal Transportation Network (MTN) in which several unimodal networks (AGVs, hoists, lifts, etc.) interact with each other via common shared workstations as to provide a variety of demand-responsive material handling operations. The material handling transport modes provide movement of work-pieces between workstations along their manufacturing routes in the MTN. The goal is to provide a declarative framework enabling to state a constraint satisfaction problem aimed at AGVs fleet match-up scheduling taking into consideration assumed itineraries of concurrently manufactured product types. In that context, treating the different product types as a set of cyclic multimodal processes is the main objective to discuss the conditions sufficient for FMS rescheduling imposed by production orders changes. To conclude, the conditions sufficient for an FMS rescheduling imposed by changes of production orders treated as cyclic multimodal processes are stated as the paper’s main contribution.
Date: 2013
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2013/407096.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2013/407096.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:407096
DOI: 10.1155/2013/407096
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().