EconPapers    
Economics at your fingertips  
 

Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times

Jae-Gon Kim, Seung-Kil Lim and June-Young Bang

Mathematical Problems in Engineering, 2015, vol. 2015, 1-11

Abstract:

Lot-order assignment is to assign items in lots being processed to orders to fulfill the orders. It is usually performed periodically for meeting the due dates of orders especially in a manufacturing industry with a long production cycle time such as the semiconductor manufacturing industry. In this paper, we consider the lot-order assignment problem (LOAP) with the objective of minimizing the total tardiness of the orders with distinct due dates. We show that we can solve the LOAP optimally by finding an optimal sequence for the single-machine total tardiness scheduling problem with nonnegative time-dependent processing times (SMTTSP-NNTDPT). Also, we address how the priority rules for the SMTTSP can be modified to those for the SMTTSP-NNTDPT to solve the LOAP. In computational experiments, we discuss the performances of the suggested priority rules and show the result of the proposed approach outperforms that of the commercial optimization software package.

Date: 2015
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/434653.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/434653.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:434653

DOI: 10.1155/2015/434653

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:434653