EconPapers    
Economics at your fingertips  
 

A Mathematical Model and Self-Adaptive NSGA-II for a Multiobjective IPPS Problem Subject to Delivery Time

Li Ba, Mingshun Yang, Xinqin Gao, Yong Liu, Zhoupeng Han, Erbao Xu and Yan Li

Mathematical Problems in Engineering, 2020, vol. 2020, 1-12

Abstract:

Process planning and scheduling are two important components of manufacturing systems. This paper deals with a multiobjective just-in-time integrated process planning and scheduling (MOJIT-IPPS) problem. Delivery time and machine workload are considered to make IPPS problem more suitable for manufacturing environments. The earliness/tardiness penalty, maximum machine workload, and total machine workload are objectives that are minimized. The decoding method is a crucial part that significantly influences the scheduling results. We develop a self-adaptive decoding method to obtain better results. A nondominated sorting genetic algorithm with self-adaptive decoding (SD-NSGA-II) is proposed for solving MOJIT-IPPS. Finally, the model and algorithm are proven through an example. Furthermore, different scale examples are tested to prove the good performance of the proposed method.

Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/6012737.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/6012737.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:6012737

DOI: 10.1155/2020/6012737

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:6012737