EconPapers    
Economics at your fingertips  
 

Productivity Formulas for a Partially Penetrating Vertical Well in a Circular Cylinder Drainage Volume

Jing Lu, Tao Zhu, Djebbar Tiab and Jalal Owayed

Mathematical Problems in Engineering, 2009, vol. 2009, 1-34

Abstract:

Taking a partially penetrating vertical well as a uniform line sink in three-dimensional space, by developing necessary mathematical analysis, this paper presents steady state productivity formulas for an off-center partially penetrating vertical well in a circular cylinder drainage volume with constant pressure at outer boundary. This paper also gives formulas for calculating the pseudo-skin factor due to partial penetration. If top and bottom reservoir boundaries are impermeable, the radius of the cylindrical system and off-center distance appears in the productivity formulas. If the reservoir has a gas cap or bottom water, the effects of the radius and off-center distance on productivity can be ignored. It is concluded that, for a partially penetrating vertical well, different productivity equations should be used under different reservoir boundary conditions.

Date: 2009
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2009/626154.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2009/626154.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:626154

DOI: 10.1155/2009/626154

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:626154