Research on Construction and Application for the Model of Multistage Job Shop Scheduling Problem
Jianzhong Xu,
Song Zhang and
Yuzhen Hu
Mathematical Problems in Engineering, 2020, vol. 2020, 1-12
Abstract:
Based on the practical application of an enterprise, we address the multistage job shop scheduling problem with several parallel machines in the first stage (production), a few parallel machines in the second stage (processing and assembly), and one machine in the following stages (including joint debugging, testing, inspection, and packaging). First, we establish the optimization objective model for the first two stages. Then, based on the design of the sequencing algorithm in the first two stages, a correction algorithm is designed between the first stage and the second stage to solve this problem systematically. Finally, we propose two benchmark approaches to verify the performance of our proposed algorithm. Verification of numerical experiments shows that the model and algorithm constructed in this paper effectively improve the production efficiency of the enterprise.
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/6357394.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/6357394.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:6357394
DOI: 10.1155/2020/6357394
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().