We present some problems against due dates with nonlinear learning and deterioration effects and past sequence dependent setup times. In this study, two effects (learning and deterioration) are used for the same processing time. The processing time of a job is shorter if it is scheduled later, rather than in the sequence. This phenomenon is known in the literature as a “learning effect.” On the other hand, in many realistic scheduling settings, a job processed later consumes more time than the same job processed earlier—this is known as scheduling with deteriorating jobs. In the past sequence dependent setup times approach, the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. In this study, we demonstrated that some problems with due dates remain polynomially solvable. However, for some other problems, we concentrated on finding polynomially solves under their special cases.
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2014/682738.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2014/682738.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:682738
DOI: 10.1155/2014/682738
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().