Supply Chain Batching Problem with Identical Orders and Lifespan
Shanlin Li,
Maoqin Li and
Hong Yan
Mathematical Problems in Engineering, 2015, vol. 2015, 1-9
Abstract:
In the real world, there are a large number of supply chains that involve the short lifespan products. In this paper, we consider an integrated production and distribution batch scheduling problem on a single machine for the orders with a short lifespan, because it may be cheaper or faster to process and distribute orders in a batch than to process and distribute them individually. Assume that the orders have the identical processing time and come from the same location, and the batch setup time is a constant. The problem is to choose the number of batches and batch sizes to minimize the total delivery time without violating the order lifespan. We first give a backward dynamic programming algorithm, but it is not an actually polynomial-time algorithm. Then we propose a constant time partial dynamic programming algorithm by doing further research into the recursion formula in the algorithm. Further, using the difference characteristics of the optimal value function, a specific calculating formula to solve the problem with the setup time being integer times of the processing time is obtained.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/716248.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/716248.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:716248
DOI: 10.1155/2015/716248
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().