Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness

Ting Wang and Dehua Xu

Mathematical Problems in Engineering, 2015, vol. 2015, 1-5

Abstract:

A single-machine scheduling problem with a mandatory maintenance whose duration is workload-dependent is considered. The start time of the maintenance is restricted to a time window. The objective is to determine the start time of the maintenance and schedule all the jobs to the machine such that the maximum lateness is minimized. An approximation algorithm based on the classical Earliest Due Date first rule is proposed. It is showed that the proposed algorithm is optimal for some special cases and that it has a tight bound for the scheduling problem under consideration.

Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/732437.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/732437.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:732437

DOI: 10.1155/2015/732437

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:732437