Corrigendum to “Model to Estimate Monthly Time Horizons for Application of DEA in Selection of Stock Portfolio and for Maintenance of the Selected Portfolio”
José Claudio Isaias,
Edson de Oliveira Pamplona and
José Henrique de Freitas Gomes
Mathematical Problems in Engineering, 2016, vol. 2016, 1-1
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2016/7458278.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2016/7458278.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:7458278
DOI: 10.1155/2016/7458278
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().