A Hybrid Approach for Evaluating Faulty Behavior Risk of High-Risk Operations Using ANP and Evidence Theory

Xia-Zhong Zheng, Fei Wang and Jian-Lan Zhou

Mathematical Problems in Engineering, 2017, vol. 2017, 1-16

Abstract:

Hydropower project construction is a high-risk operation, where accidents occur frequently. Moreover, the factors leading to accidents are often human factors, so safety evaluation of these factors for the hydropower projects’ work system is very significant. The Human Factors Analysis and Classification System (HFACS) framework is applied to build evaluation system. In the evaluation process, correlation analysis is used to form the intercriteria analysis matrix that helps the decision makers to build impact relation matrix. Factor weights are calculated by the Analytic Network Process (ANP). In the index value determination step, the evidence theory is used to eliminate the conflicts of three decision makers and the index values are then calculated. The faulty behavior risk (FBR) assessment value is finally obtained. The proposed method is practical and its applicability is proved by an example.

Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2017/7908737.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2017/7908737.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:7908737

DOI: 10.1155/2017/7908737

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:7908737