A New Extended MILP MRP Approach to Production Planning and Its Application in the Jewelry Industry
Erhan Yazıcı,
Gülçin Büyüközkan and
Murat Baskak
Mathematical Problems in Engineering, 2016, vol. 2016, 1-18
Abstract:
It is important to manage reverse material flows such as recycling, reusing, and remanufacturing in a production environment. This paper addresses a production planning problem which involves reusing of scrap and recycling of waste that occur in the various stages of the production process and remanufacturing/recycling of returns in a closed-loop supply chain environment. An extended material requirement planning (MRP) is proposed as a mixed integer linear programming (MILP) model which includes—beside forward—these reverse material flows. The proposed model is developed for the jewelry industry in Turkey, which uses gold as the primary resource of production. The aim is to manage these reverse material flows as a part of production planning to utilize resources. Considering the mostly unpredictable nature of reverse material flows, the proposed model is likewise transformed into a fuzzy model to provide a better review of production plan for the decision maker. The suggested model is examined through a case study to test the applicability and efficiency.
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2016/7915673.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2016/7915673.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:7915673
DOI: 10.1155/2016/7915673
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().