Mathematical Modeling and Discrete Firefly Algorithm to Optimize Scheduling Problem with Release Date, Sequence-Dependent Setup Time, and Periodic Maintenance
Mustafa A. Qamhan,
Ammar A. Qamhan,
Ibrahim M. Al-Harkan and
Yousef A. Alotaibi
Mathematical Problems in Engineering, 2019, vol. 2019, 1-16
Abstract:
An evolutionary discrete firefly algorithm (EDFA) is presented herein to solve a real-world manufacturing system problem of scheduling a set of jobs on a single machine subject to nonzero release date, sequence-dependent setup time, and periodic maintenance with the objective of minimizing the maximum completion time “makespan.” To evaluate the performance of the proposed EDFA, a new mixed-integer linear programming model is also proposed for small-sized instances. Furthermore, the parameters of the EDFA are regulated using full factorial analysis. Finally, numerical experiments are performed to demonstrate the efficiency and capability of the EDFA in solving the abovementioned problem.
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2019/8028759.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2019/8028759.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:8028759
DOI: 10.1155/2019/8028759
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().