EconPapers    
Economics at your fingertips  
 

A Model for Sorting Activities to Be Outsourced in Civil Construction Based on ROR-UTADIS

Rachel Perez Palha, Adiel Teixeira de Almeida and Luciana Hazin Alencar

Mathematical Problems in Engineering, 2016, vol. 2016, 1-15

Abstract:

The subcontractor’s selection problem is currently treated as a supply chain problem with a prequalification procedure to balance the main objectives of the client: cost, quality, and time. Unfortunately, most of the selection processes are analysed under the same methodology without considering that variations in project, type of activity, and other attributes should affect the chosen method. To provide a novel form of treating subcontractor’s selection, we proposed an additive sorting method to categorize activities to be outsourced in civil construction based on ROR-UTADIS method, which is a modification of the UTADIS method that includes new forms of supplying preference information. It was applied in the construction of a brewery in Brazil. It was perceived that the method is applicable and intuitive for decision makers, even though there are quite a few points to be taken, analysed to avoid misclassification.

Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2016/9236414.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2016/9236414.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:9236414

DOI: 10.1155/2016/9236414

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:9236414