Optimization Method of Power Equipment Maintenance Plan Decision-Making Based on Deep Reinforcement Learning
Yanhua Yang and
Ligang Yao
Mathematical Problems in Engineering, 2021, vol. 2021, 1-8
Abstract:
The safe and reliable operation of power grid equipment is the basis for ensuring the safe operation of the power system. At present, the traditional periodical maintenance has exposed the abuses such as deficient maintenance and excess maintenance. Based on a multiagent deep reinforcement learning decision-making optimization algorithm, a method for decision-making and optimization of power grid equipment maintenance plans is proposed. In this paper, an optimization model of power grid equipment maintenance plan that takes into account the reliability and economics of power grid operation is constructed with maintenance constraints and power grid safety constraints as its constraints. The deep distributed recurrent Q -networks multiagent deep reinforcement learning is adopted to solve the optimization model. The deep distributed recurrent Q -networks multiagent deep reinforcement learning uses the high-dimensional feature extraction capabilities of deep learning and decision-making capabilities of reinforcement learning to solve the multiobjective decision-making problem of power grid maintenance planning. Through case analysis, the comparative results show that the proposed algorithm has better optimization and decision-making ability, as well as lower maintenance cost. Accordingly, the algorithm can realize the optimal decision of power grid equipment maintenance plan. The expected value of power shortage and maintenance cost obtained by the proposed method is $71.75$ $MW·H$ and $496000$ $yuan$.
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2021/9372803.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2021/9372803.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:9372803
DOI: 10.1155/2021/9372803
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().