Study on Floor Mechanical Failure Characteristics and Stress Evolution in Double Predriven Recovery Rooms
Guorui Feng,
Songyu Li,
Pengfei Wang,
Jun Guo,
Ruipeng Qian,
Qiang Sun,
Chenliang Hao,
Xiaoze Wen and
Jianan Liu
Mathematical Problems in Engineering, 2020, vol. 2020, 1-13
Abstract:
This paper takes the double predriven recovery rooms (DPRR) of 31109 panel of a coal mine in Inner Mongolia as a case study. DPRRs are used to withdraw mining equipment, which play a significant role in safe and efficient production in the final longwall mining stage. Theoretical analysis and numerical simulation were carried out to study the reasonable size of the front abutment pillar between DPRR (inter-DPRR pillar) and the damage depth of the DPRR floor. The results show that (1) the stress distribution of the fender (the remnant longwall panel) can be approximately divided into three stages with the advance of the working face: stress redistribution (the first) stage, stress superimposed growth (the second) stage, and stress transfer (the third) stage. (2) According to stress distribution and the corresponding failure mode of the fender, the calculation model of the slippage damage of the DPRR floor is rectified, and the damage range of the floor is rezoned to make it more suitable for the damage depth of the room. (3) The zone of influence of the front abutment pressure is 40–50 m, and the stress around the DPRR increases significantly in the final mining stage. When the size of the inter-DPRR pillar is greater than 15 m, the effect of increasing the coal pillar size on lowering the peak stress of the main predriven recovery room is limited. (4) Floor heave tends to increase at first and then decrease with depth and reaches the maximum in the depth of 5 m in the final mining stage, indicating that 5 m is the starting point for the initial depth of the floor heave. (5) The theoretical calculation shows that the reasonable size of the inter-DPRR pillar is 20 m, and the critical width of the fender is 18.48 m, which can guide the secondary support to prevent dynamic disasters. Floor grouting and constructing concrete floor are effective and economic ways to control the floor heave.
Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/9391309.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/9391309.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:9391309
DOI: 10.1155/2020/9391309
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().