Steam Power Plant Design Upgrading (Case Study: Khoms Steam Power Plant)
Hesham G. Ibrahim,
Mokhtar S. Elatrash and
Aly Y. Okasha
Energy and Environment Research, 2011, vol. 1, issue 1, 202
Abstract:
Built during the seventies and commissioned in 1980, Khoms Steam Power Plant consists of four units. A proposed design modifications based on Hysys simulation is to improve the overall efficiency, reduce gas emissions and lower operation and maintenance costs. Five proposed modifications based on reduction of heat loss from the condenser and lowering heating rate reveal that a single open feedwater heater process is the optimum design modification of Rankine cycle to achieve the targeted objectives.
Date: 2011
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://ccsenet.org/journal/index.php/eer/article/download/13982/9693 (application/pdf)
https://ccsenet.org/journal/index.php/eer/article/view/13982 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ibn:eerjnl:v:1:y:2011:i:1:p:202
Access Statistics for this article
More articles in Energy and Environment Research from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().