EconPapers    
Economics at your fingertips  
 

Assessment of Investment in Small Hydropower Plants

Perica Ilak and Slavko Krajcar

Energy and Environment Research, 2013, vol. 3, issue 2, 33

Abstract: In this study an assessment of investments in a hydropower plants is considered. The objective of this work is to maximize the net present value from selling energy. Because of the stochastic nature of river flows, flow duration curve is constructed to take into account hydropower plant capacity factor, important for the assessment of investment. Proposed mixed-integer linear programming model is flexible and accounts for nonlinear three-dimensional (3-D) relationship between the produced power, the discharged water, and the head of the associated reservoir. Continuous chain of imaginary run-of-river plants is considered on the Sava river stretch (Croatia) from border with Slovenia to city of Sisak.

Date: 2013
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://ccsenet.org/journal/index.php/eer/article/download/27487/17431 (application/pdf)
https://ccsenet.org/journal/index.php/eer/article/view/27487 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ibn:eerjnl:v:3:y:2013:i:2:p:33

Access Statistics for this article

More articles in Energy and Environment Research from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().

 
Page updated 2025-03-19
Handle: RePEc:ibn:eerjnl:v:3:y:2013:i:2:p:33