A Mathematical Modeling for Delivery Time in Dynamic PERT Networks

Mahtab Afsari and Hesam Javadi Vasigh

Modern Applied Science, 2016, vol. 10, issue 3, 214

Abstract: In project management, the main purpose of proposed methods is project scheduling which helps to managementand planning. We can calculate a real average of project closure in dynamic PERT networks by identifying alower limit. According to randomness, each distribution parameter varies itself and also it is proposed thatactivity durations are exponential distributions which have casual, unstable and independent variables. We usedhypothetic kinetic programming, that project closure time would have a lower limit. Finally, delivery time wouldobtain optimal due date by minimizing the expected aggregate cost per project and also a linear function of itsdue-date.

Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://ccsenet.org/journal/index.php/mas/article/download/57814/30924 (application/pdf)
https://ccsenet.org/journal/index.php/mas/article/view/57814 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ibn:masjnl:v:10:y:2016:i:3:p:214

Access Statistics for this article

More articles in Modern Applied Science from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().

 
Page updated 2025-03-19
Handle: RePEc:ibn:masjnl:v:10:y:2016:i:3:p:214