Significant Factors Causing Time Overrun in Construction Projects of Peninsular Malaysia
Aftab Memon,
Ismail Rahman,
Muhammad Akram and
Nornashima Ali
Modern Applied Science, 2014, vol. 8, issue 4, 16
Abstract:
This study has identified the significant factors causing time overrun in Malaysian construction industry. Investigation through survey was carried out in central and southern parts of Malaysian among the respondents from three categories i.e. client, consultant and contractors. The feedback was received from 75 respondents against 300 companies contacted. The feedback was analyzed statistically which revealed that cash flow and financial difficulties faced by contractor, poor site management and supervision, incompetent subcontractor, shortage of workers and financial difficulties of the owner are major contributors of time overrun. The author recommends that the problem of time overrun can be controlled through proper planning of work, committed leadership and management, and effective communication system.
Date: 2014
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://ccsenet.org/journal/index.php/mas/article/download/35413/21316 (application/pdf)
https://ccsenet.org/journal/index.php/mas/article/view/35413 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ibn:masjnl:v:8:y:2014:i:4:p:16
Access Statistics for this article
More articles in Modern Applied Science from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().