EconPapers    
Economics at your fingertips  
 

Quality- and profit-oriented scheduling of resource-constrained projects with flexible project structure via a genetic algorithm

Carolin Kellenbrink and Stefan Helber ()

European Journal of Industrial Engineering, 2016, vol. 10, issue 5, 574-595

Abstract: We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with respect to the implementation of the optional activities. Such decisions affect the duration, cost, quality and eventual revenue of the project. Examples of this type of problem can often be found when complex capital goods such as aircraft engines are overhauled, or when buildings are renovated to meet higher environmental and efficiency standards. We describe the problem, develop a mixed-integer optimisation model, explain specific features of a genetic algorithm to solve the problem and report the results of a numerical study. [Received 26 December 2014; Revised 15 July 2015; Revised 22 September 2015; Accepted 10 March 2016]

Keywords: resource-constrained projects; genetic algorithms; project scheduling; flexible project structure; quality-oriented scheduling; profit-oriented scheduling; project duration; project cost; project quality; project revenue; mixed-integer optimisation. (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://www.inderscience.com/link.php?id=78807 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:10:y:2016:i:5:p:574-595

Access Statistics for this article

More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-30
Handle: RePEc:ids:eujine:v:10:y:2016:i:5:p:574-595