Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
Jae-Min Yu and
Dong-Ho Lee
European Journal of Industrial Engineering, 2018, vol. 12, issue 1, 1-23
Abstract:
This study addresses a job shop scheduling problem in which jobs are grouped into job families, but they are processed individually using their distinct routings. Unlike the previous studies, we consider a due-date-based objective of minimising the total family tardiness, i.e., sum of positive deviations between the due-dates and the completion times of job families. A mixed integer programming model is developed to represent the problem mathematically. Then, an optimal algorithm is proposed using the branch and bound technique while developing a job family-based lower bound. For practical applications up to large sized instances, two types of heuristics, modified shifting bottleneck and priority scheduling algorithms, are also proposed. To test the performances of the three types of solution algorithms, computational experiments were done on a number of test instances and the results are reported. [Received: 10 September 2016; Revised: 28 February 2017; Revised: 6 June 2017; Accepted: 22 August 2017]
Keywords: job shop scheduling; job families; family tardiness; branch and bound; heuristics. (search for similar items in EconPapers)
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=89876 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:12:y:2018:i:1:p:1-23
Access Statistics for this article
More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().