A simulation study on CONWIP system design for bicycle chain manufacturing
Yu-Hsiu Hung,
Kuan-Cheng Huang and
Taho Yang
European Journal of Industrial Engineering, 2022, vol. 16, issue 1, 31-40
Abstract:
The aim of the study was to demonstrate the effectiveness of constant work-in-process (CONWIP) pull system to bike chain production. Two multi-CONWIP production systems (developed by Kaizen, as well as by looking at the bottlenecks) were proposed to prevent WIP accumulations. Simulation was performed on the average lead time and the total WIP of the two multi-CONWIP systems in comparison with those of a current bike chain production system. Results of the comparisons showed that the Kaizen multi-CONWIP system outperformed all the other systems on the average lead time (with up to 42.8% improvements). The bottleneck multi-CONWIP system were able to reduce the WIP volume by over 50%, outperforming the Kaizen multi-CONWIP system and the current production system. These results show that multi-CONWIP has potential in reducing production lead time and WIP and can better satisfy customer demands. [Received: 18 March 2020; Accepted: 27 January 2021]
Keywords: bike chain; constant work in process; CONWIP; kanban; pull production; simulation optimisation. (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=119370 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:16:y:2022:i:1:p:31-40
Access Statistics for this article
More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().