EconPapers    
Economics at your fingertips  
 

Two-machine flowshop scheduling with fuzzy processing times and flexible operations

Zeynep Uruk and Ayten Yılmaz Yalçıner

European Journal of Industrial Engineering, 2024, vol. 18, issue 1, 100-119

Abstract: This paper considers a two-machine flowshop scheduling problem with fuzzy processing times and flexible operations to minimise makespan. The jobs have three operations, one of which is a flexible operation that can be processed on one of the machines. The flexible operation should be assigned to one of the machines. Moreover, the processing times on the machines are not fixed but fuzzy processing times which are assumed to have triangular possibility distributions. Firstly, a possibilistic mathematical model is proposed with fuzzy processing times and then it is converted to an auxiliary crisp model using the weighted average defuzzification method. For the large cases where the exact algorithm may not be efficient, a heuristic algorithm is proposed. [Received: 24 May 2022; Accepted: 18 October 2022]

Keywords: scheduling; flowshop; makespan; fuzzy processing times; flexible operations. (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=135387 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:18:y:2024:i:1:p:100-119

Access Statistics for this article

More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:eujine:v:18:y:2024:i:1:p:100-119