Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software
Andreas Witt and
Stefan Voss
European Journal of Industrial Engineering, 2011, vol. 5, issue 1, 81-100
Abstract:
In this paper, a case study accomplished for the production planning of a German steel producer is presented. This includes the description of a lot-sizing problem and a related simple mathematical model formulated in order to meet the requirements for the mid- to long-term planning of the steel producer. Both the mathematical model and the representation of the results had to be implemented based on standard software products, namely the 'ILOG OPL-Studio' from IBM and the 'Advanced Planner and Optimizer' (APO) from SAP. The main focus is on the model and its implementation. That is, we show that a real-world problem can be solved by means of a simple mathematical model and standard software products reducing the individual programming effort. [Submitted 02 February 2009; Revised 06 November 2009, 16 February 2009; Accepted 23 February 2010]
Keywords: production planning; lot sizing; campaign production; commercial solvers; steel industry; Germany; mathematical modelling; standard software. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=37227 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:5:y:2011:i:1:p:81-100
Access Statistics for this article
More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().