EconPapers    
Economics at your fingertips  
 

A hybrid CP/MILP method for scheduling with energy costs

Alain Haït and Christian Artigues

European Journal of Industrial Engineering, 2011, vol. 5, issue 4, 471-489

Abstract: This paper deals with energy-related job scheduling for a foundry, in order to minimise the electricity bill. Accounting for energy and human resource constraints leads to better solutions in terms of cost and overall energy consumption. We propose a hybrid heuristic based on a two-step constraint/mathematical programming approach that improves significantly the computation time, compared to the full MILP model. [Recieved: 26 August 2009; Revised: 22 April 2010; Accepted: 13 June 2010]

Keywords: scheduling; energy costs; human resources; parallel machines; hybrid approach; electricity costs; energy consumption; constraint programming; mathematical programming. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.inderscience.com/link.php?id=42742 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:eujine:v:5:y:2011:i:4:p:471-489

Access Statistics for this article

More articles in European Journal of Industrial Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:eujine:v:5:y:2011:i:4:p:471-489