Implementing COCOMO II as personnel direct cost in an owner estimate cost model for software project
Sholiq Sholiq,
Apol Pribadi Subriadi,
Eko Wahyu Tyas Darmaningrat and
Abdul Azis
International Journal of Business Information Systems, 2022, vol. 41, issue 4, 472-503
Abstract:
COCOMO II is a method to get effort, time (schedule), and cost for software development. In this study, COCOMO II was used to obtain personnel direct costs of a software development project. Personnel direct costs were one of the three components that compose the owner estimate cost. The purpose of this study was to propose a conceptual model to determine the owner estimate cost that was formed from three components, namely: personnel direct cost, non-personnel direct costs, and taxes. In this study, it was explained the stages of using the model to determine the owner estimate cost for software development projects.
Keywords: COCOMO II; owner estimate cost; OEC; software cost; software project. (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=127559 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijbisy:v:41:y:2022:i:4:p:472-503
Access Statistics for this article
More articles in International Journal of Business Information Systems from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().