Productivity improvement through lean initiative in a surgical equipment manufacturing company: a case study
P.G. Saleeshya and
Ajai Bhadran
International Journal of Business and Systems Research, 2015, vol. 9, issue 4, 297-314
Abstract:
The paper presents a case study conducted at a surgical equipment manufacturing company, where productivity improvement can be achieved by reducing the lead time required to manufacture their product. Using an important lean tool value stream mapping (VSM) the various wastes that are held up at each stage of manufacturing is identified, from which the most critical waste has been selected using a cost-time profile (CTP). Then a model is developed and solved using regression analysis. Based on the values obtained a cost-time profile is drawn again and compared, which reveals that there is nearly a 50% increase in the overall productivity.
Keywords: lean manufacturing; value stream mapping; VSM; cost-time profile; CTP; regression analysis; productivity improvement; surgical equipment manufacturing; case study; lead time reduction. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=72580 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijbsre:v:9:y:2015:i:4:p:297-314
Access Statistics for this article
More articles in International Journal of Business and Systems Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().