EconPapers    
Economics at your fingertips  
 

Load-dependent production planning for an assemble-to-order system

Tarik Aouam

International Journal of Engineering Management and Economics, 2012, vol. 3, issue 1/2, 40-57

Abstract: Assemble-to-order (ATO) systems enable manufacturing firms to be cost-effective and at the same time responsive to changing customer orders. In this paper, we study an assemble-to-order (ATO) system, where raw materials are released into a capacitated production stage. Inventory of produced components is kept in stock ready for final assembly once specific orders for products are received. An important planning issue is to find an optimal trade-off between capacity utilisation and components inventory holding cost with the aim to meet uncertain demand of end products. In this paper, we formulate two integrated production/inventory planning models using clearing functions while considering demand uncertainty. In the first model, we assume that demand is normally distributed and propose a chance constrained formulation. In the second model, we consider the case of unknown demand distributions and use a robust optimisation approach. The proposed models are linear programmes that provide safe production plans. We illustrate the proposed models using a real case study from the literature and analyse the effect of congestion and demand uncertainty.

Keywords: assemble-to-order systems; ATO; production planning; load-dependent lead times; clearing functions; service level requirements; robust optimisation; manufacturing industry; capacity utilisation; inventory holding cost; inventory planning; demand uncertainty. (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=48604 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijemec:v:3:y:2012:i:1/2:p:40-57

Access Statistics for this article

More articles in International Journal of Engineering Management and Economics from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijemec:v:3:y:2012:i:1/2:p:40-57