Impact of volume, routing and product mix flexibilities on the performance of a job shop: a simulation study
B. Shoban Babu and
G. Srinivasan
International Journal of Enterprise Network Management, 2010, vol. 4, issue 2, 107-135
Abstract:
In this paper, the impact of the factors batch size, setup times, priority dispatching of jobs, machine failures, rework, volume, routing and product flexibility on the performance of a job shop is studied. The performance of the simulation models are measured in four dimensions: mean flow time, average work-in process, percentage throughput of the shop and the percentage of jobs meeting their due dates. The simulation results show that routing flexibility and machine selection rules have significant impact on the system performance. It is also found that the system performance starts to deteriorate when the level of routing flexibility increases.
Keywords: flexible job shops; volume flexibility; routing flexibility; product mix flexibility; simulation; Taguchi methods; experimental design; job shop performance; batch size; setup times; priority dispatching; machine failure; rework; product flexibility; machine selection. (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=37930 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijenma:v:4:y:2010:i:2:p:107-135
Access Statistics for this article
More articles in International Journal of Enterprise Network Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().