A CBA model of a hydro project in Sri Lanka
Risako Morimoto and
Chris Hope
International Journal of Global Energy Issues, 2004, vol. 21, issue 1/2, 47-68
Abstract:
This study demonstrates an empirical application of a cost benefit analysis for hydro projects, which includes social and environmental as well as economic aspects. The model treats uncertain inputs by specifying them as probability distributions. A proposed hydro project in Sri Lanka is used as a case study. The study uses time variable discount rates related to economic growth and investigates the sensitivity of the net present value to the choice of a discount rate.
Keywords: cost benefit analysis; dam; hydropower; Sri Lanka; sustainable development; uncertainty. (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=4693 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijgeni:v:21:y:2004:i:1/2:p:47-68
Access Statistics for this article
More articles in International Journal of Global Energy Issues from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().