EconPapers    
Economics at your fingertips  
 

A CBA model of a hydro project in Sri Lanka

Risako Morimoto and Chris Hope

International Journal of Global Energy Issues, 2004, vol. 21, issue 1/2, 47-68

Abstract: This study demonstrates an empirical application of a cost benefit analysis for hydro projects, which includes social and environmental as well as economic aspects. The model treats uncertain inputs by specifying them as probability distributions. A proposed hydro project in Sri Lanka is used as a case study. The study uses time variable discount rates related to economic growth and investigates the sensitivity of the net present value to the choice of a discount rate.

Keywords: cost benefit analysis; dam; hydropower; Sri Lanka; sustainable development; uncertainty. (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=4693 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijgeni:v:21:y:2004:i:1/2:p:47-68

Access Statistics for this article

More articles in International Journal of Global Energy Issues from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-30
Handle: RePEc:ids:ijgeni:v:21:y:2004:i:1/2:p:47-68