A modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem

Srijith Rajeev, Sabu Kurian and Brijesh Paul

International Journal of Information and Decision Sciences, 2015, vol. 7, issue 3, 241-254

Abstract: This paper proposes a modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem (RCPSPWET). Project activities are assumed to have known unit earliness and tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in such a way that it minimises the total weighted earliness-tardiness penalty cost of the project, subject to the precedence constraints and the constant renewable resource availability constraints. A modified serial scheduling scheme using a sliding factor is proposed along with a heuristic method for solving the RCPSPWET.

Keywords: particle swarm optimisation; PSO; project scheduling; serial scheduling scheme; resource constrained scheduling; weighted earliness tardiness; project management; precedence constraints; renewable resources; resource availability; sliding factor. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.inderscience.com/link.php?id=71373 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijidsc:v:7:y:2015:i:3:p:241-254

Access Statistics for this article

More articles in International Journal of Information and Decision Sciences from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijidsc:v:7:y:2015:i:3:p:241-254