A modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem
Srijith Rajeev,
Sabu Kurian and
Brijesh Paul
International Journal of Information and Decision Sciences, 2015, vol. 7, issue 3, 241-254
Abstract:
This paper proposes a modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem (RCPSPWET). Project activities are assumed to have known unit earliness and tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in such a way that it minimises the total weighted earliness-tardiness penalty cost of the project, subject to the precedence constraints and the constant renewable resource availability constraints. A modified serial scheduling scheme using a sliding factor is proposed along with a heuristic method for solving the RCPSPWET.
Keywords: particle swarm optimisation; PSO; project scheduling; serial scheduling scheme; resource constrained scheduling; weighted earliness tardiness; project management; precedence constraints; renewable resources; resource availability; sliding factor. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.inderscience.com/link.php?id=71373 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijidsc:v:7:y:2015:i:3:p:241-254
Access Statistics for this article
More articles in International Journal of Information and Decision Sciences from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().