EconPapers    
Economics at your fingertips  
 

Objectives and constraints in advanced planning problems with regard to scale of production output and plan hierarchical level

Yuri Mauergauz

International Journal of Industrial and Systems Engineering, 2012, vol. 12, issue 4, 369-393

Abstract: This paper seeks to determine cases, when multi-criteria production planning is necessary, and to give rough, but simple, method of this planning. The production planning problem is addressed, where the quantity of the product required (demand) in future periods is forecast, using which one must decide when and how much to produce. Accordance of various classifications used by operation theory and commercial software is ascertained. Limits of single criteria planning are determined, and dynamic approach to production planning is demonstrated. This paper extends the research on production planning classification and multi-criteria planning which is accumulated in the literature over the last 30 years.

Keywords: objective functions; constraints; hierarchical level; multicriteria planning; advanced planning; production planning; demand quantity; forecasting. (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=50120 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:12:y:2012:i:4:p:369-393

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:12:y:2012:i:4:p:369-393