Dynamic Pareto-optimal group scheduling for a single machine
Yuri Mauergauz
International Journal of Industrial and Systems Engineering, 2014, vol. 16, issue 4, 537-559
Abstract:
This paper seeks to determine a dynamic Pareto-optimal method for a single machine scheduling based on two criteria simultaneously: setup expenditure criterion and average orders utility criterion. Series-batch and parallel-batch problems with sequence-dependent setup times are considered. In this method the concept of production intensity as dynamic production process parameter is used. A set of applied software allows scheduling for middle quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.
Keywords: group scheduling; production intensity; series batches; parallel batches; Pareto optimality; single machine scheduling; sequence-dependent setup times. (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=60658 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:16:y:2014:i:4:p:537-559
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().