EconPapers    
Economics at your fingertips  
 

Dynamic Pareto-optimal group scheduling for a single machine

Yuri Mauergauz

International Journal of Industrial and Systems Engineering, 2014, vol. 16, issue 4, 537-559

Abstract: This paper seeks to determine a dynamic Pareto-optimal method for a single machine scheduling based on two criteria simultaneously: setup expenditure criterion and average orders utility criterion. Series-batch and parallel-batch problems with sequence-dependent setup times are considered. In this method the concept of production intensity as dynamic production process parameter is used. A set of applied software allows scheduling for middle quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.

Keywords: group scheduling; production intensity; series batches; parallel batches; Pareto optimality; single machine scheduling; sequence-dependent setup times. (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=60658 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:16:y:2014:i:4:p:537-559

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:16:y:2014:i:4:p:537-559