A case study of grouping machines based on failure components planning model
Ernnie Illyani Basri,
Hasnida Ab-Samat and
Shahrul Kamaruddin
International Journal of Industrial and Systems Engineering, 2014, vol. 18, issue 1, 31-50
Abstract:
Preventive maintenance (PM) operations are normally practiced by organisations to maintain the integrity of equipment and to avoid occurrences of failure. However, machine downtime continues to be a major issue even if PM is done periodically. Machines fail to operate because of faulty components. This paper presents a planning model on grouping machines based on failure components that adopts group technology principle to group machines based on failure rate, thus allowing for PM to be conducted in groups. The model is then validated and applied to a case study conducted in a semiconductor company. The application can be used to simplify maintenance operations in terms of PM planning.
Keywords: preventive maintenance; group technology; machine downtime; component failure; faulty components; maintenance operations; maintenance planning; case study; machine grouping; semiconductor manufacturing. (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=64338 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:18:y:2014:i:1:p:31-50
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().