EconPapers    
Economics at your fingertips  
 

Project time and cost estimate at completion based on non-parametric resampling with interval risk

Afshin Kamyabniya, Seyed Mohammad Seyedhoseini and Saied Yaghoubi

International Journal of Industrial and Systems Engineering, 2015, vol. 21, issue 4, 458-473

Abstract: Control and feedback in complex and sensitive systems with different resources and properties in uncertainty conditions are one of the significant challenges for project managers. Therefore, in this paper, an integrated model with quantitative and qualitative approach based on earned value management and risk analysis methods proposed to decrease deviations in time and cost estimation at complete (EAC(t) and EAC). Using the proposed performance indexes based on risk scores obtained by non-parametric resampling technique, namely bootstrap, calculating more accurate estimations of final cost and duration at lower and upper band with various confidence levels will be possible. Finally, an illustrative case study presented demonstrating the proposed model can be efficiently applied through real case software projects.

Keywords: earned value management; EVM; risk assessment; completion cost estimation; completion time estimation; software engineering; software management; non-parametric bootstrap; non-parametric resampling; project time; project cost; project completion; interval risk; software projects; project management. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=72729 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:21:y:2015:i:4:p:458-473

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:21:y:2015:i:4:p:458-473