A new proactive approach to construct a robust baseline schedule considering quality factor

Behrouz Afshar-Nadjafi

International Journal of Industrial and Systems Engineering, 2016, vol. 22, issue 1, 63-72

Abstract: Extensive research has been devoted to project scheduling problems. However, little attention has been paid to quality factor. The assumption of deterministic parameters especially perfect output of accomplished activities is common in the project planning, whereas activities quality is subject to uncertainty. This may lead to rework for activities, as a consequence, serious revisions of the schedule baseline. In this paper, we consider the robust project scheduling problem to cope with reworks during project execution. A recursive procedure is proposed to solve the problem including time buffers between activities which is a proven method to improve the robustness of a baseline schedule. Also, an extensive simulation-based analysis of the performance of proposed procedure is given. Finally, the results are discussed in detail.

Keywords: project scheduling; quality; recursive procedure; heuristics; rework; time buffers; simulation; proactive approach. (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.inderscience.com/link.php?id=73260 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:22:y:2016:i:1:p:63-72

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:22:y:2016:i:1:p:63-72