Period of processing for multi-entry and multi-outlet non-blocking serial production line
Peng Li,
Yuegang Tao,
Bingling Cai,
Zilong Zhang and
Peng Yang
International Journal of Industrial and Systems Engineering, 2017, vol. 27, issue 1, 1-27
Abstract:
The period of processing of multi-entry and multi-outlet serial production line is studied in this paper. The computational algorithms of production periods of multi-entry and multi-outlet serial production line under non-blocking optimal control are given. The algorithms contain the computational algorithms of production periods of single-entry and single-outlet, single-entry and multi-outlet, multi-entry and single-outlet serial production lines, as the special cases. The algorithms based on max-plus algebra are constructive. A numerical example is provided to illustrate the computational algorithms.
Keywords: multi-entry and multi-outlet; production period; serial production line; system control and optimisation. (search for similar items in EconPapers)
Date: 2017
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=85752 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:27:y:2017:i:1:p:1-27
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().