Economic risk assessment of EPC projects using fuzzy TOPSIS approach
Farzad Firouzi Jahantigh,
Behnam Malmir and
Behzad Aslani Avilaq
International Journal of Industrial and Systems Engineering, 2017, vol. 27, issue 2, 161-179
Abstract:
Economic recession in developing countries has forced authorities to set policies in order to mitigate financial risks such as inflation, liquidity and credit, as investigated in this project. The main goals of this research were to identify significant financial risks of engineering procurement construction (EPC) projects and to evaluate and prioritise the financial risks based on the well-known fuzzy TOPSIS model. A case study in a refinery project with national domain was considered, with emphasis on big investment, refinery capacity in gross domestic product, and the role of EPC projects in the development of the country. In this research, risks were categorised and extracted by interviewing experts of EPC projects in various levels of authority, and then risk prioritisation was conducted according to the fuzzy TOPSIS model. Finally, the proposed model was compared to other models in the literature and to expertise method in order to determine its progress.
Keywords: economic risks; EPC projects; fuzzy TOPSIS decision making model; risk assessment. (search for similar items in EconPapers)
Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.inderscience.com/link.php?id=86349 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:27:y:2017:i:2:p:161-179
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().