EconPapers    
Economics at your fingertips  
 

A general variable neighbourhood search for multi-skill resource-constrained project scheduling problem with step-deterioration

Huafeng Dai, Wenming Cheng, Wucheng Yang and Yupu Wang

International Journal of Industrial and Systems Engineering, 2020, vol. 34, issue 2, 145-164

Abstract: This paper proposes a general variable neighbourhood search approach (GVNS) for solving the multi-skill resource constrained project scheduling problem (MS-RCPSP) under step-deterioration aiming to minimise maximum completion time. To assess the performance of the proposed GVNS, integrating five neighbourhood structures and a disturbance step, computational experiments are carried out on two sets instances. One group takes no account of deterioration where the proposed GVNS achieved highly performance compared with the state-of-the-art algorithms in the literature, and the other group of experiments on modified dataset considering the step-deterioration effect also demonstrates the capability of the GVNS to find high quality solutions.

Keywords: deterioration effect; multi-skill; resource constrained project scheduling problem; RCPSP; variable neighbourhood search; VNS. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.inderscience.com/link.php?id=105288 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:34:y:2020:i:2:p:145-164

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:34:y:2020:i:2:p:145-164