Scheduling of automated guided vehicles and machines in flexible manufacturing systems: a simulation study
Essam Kaoud,
Mahmoud Heshmat,
Mahmoud A. El-Sharief and
Mohamed G. El-Sebaie
International Journal of Industrial and Systems Engineering, 2020, vol. 35, issue 3, 372-387
Abstract:
Flexible manufacturing systems (FMSs) have widely expanded in industry sectors all over the world. Scheduling is one of the problems that face the life cycle of FMSs. This paper introduces the simultaneous scheduling problem of automated guided vehicles (AGVs) and machines in FMSs. The study is based on discrete event simulation (DES) to solve that problem using benchmark data used by previous studies. The objective of this study is to determine the starting and completion times of each job to minimise the makespan. The results validate the robustness of the simulation model, especially for large-scale problems. Furthermore, they are compared against the other approaches and show consistency.
Keywords: flexible manufacturing system; FMSs; automated guided vehicle; AGVs; scheduling; simulation. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=107775 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:35:y:2020:i:3:p:372-387
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().