An EPQ model for an imperfect production system with rework, scrap and backorder
Pablo Biswas and
Scott R. Schultz
International Journal of Industrial and Systems Engineering, 2021, vol. 37, issue 4, 411-431
Abstract:
This paper deals with an imperfect two-stage manufacturing process that orders raw materials from a supplier and produces finished goods with defective items that can be reworked. The generation of scrap during the initial production stage, during inspection, and during the rework stage is also considered. To fulfil customer demand a permissible backorder is also considered. First, an inventory model is developed for this two-stage production process with instantaneous raw material order, in-cycle rework, and scrap. Then, a total cost function is developed to simultaneously find the optimal economic production quantity, optimal backorder quantity, and optimal order quantity. The cost function of the proposed inventory model is verified and validated using numerical examples and sensitivity analysis.
Keywords: imperfect production; inventory model; defective items; rework; scrap; backorder. (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=114048 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:37:y:2021:i:4:p:411-431
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().