Automotive robotic body shop simulation for performance improvement using plant feedback
Annamalai Pandian and
Ahad Ali
International Journal of Industrial and Systems Engineering, 2011, vol. 7, issue 3, 269-291
Abstract:
This paper illustrates how to improve robotic automotive body shop throughput by feeding back actual plant data for input variables for entities to improve discrete simulation model prediction and validation. The input variables are adjusted based on actual plant data, and the simulation model was run for various scenarios to verify and validate the discrete simulation model. The general tendency in an automotive plant body shop is to buy more equipment to improve throughput. It is very interesting to see how mean time to repair/mean time between failure assumptions affect the throughput. The bottleneck issues are identified for automotive plant to improve throughput.
Keywords: automotive body shops; performance improvement; robotics; plant feedback; plant data; input variables; discrete simulation models; simulation model validation; simulation model prediction; equipment purchase; improved throughput; repair times; mean time; failure assumptions; bottlenecks; USA; United States; industrial engineering; systems engineering. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=38980 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:7:y:2011:i:3:p:269-291
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().