Analysis of an EPC project: a solution to the resource constrained project scheduling problem using genetic algorithms

M. Suresh, Pankaj Dutta and Karuna Jain

International Journal of Industrial and Systems Engineering, 2011, vol. 8, issue 2, 251-269

Abstract: This study employs a generalised resource constrained project scheduling problem to estimate an optimal schedule for an engineering–procurement–construction (EPC) project. We present a decision support system using a repetitive mutation-based genetic algorithm for solving multiple resource constrained problems while scheduling the activities in a construction project. The objective is to determine the minimum makespan of the project subject to the precedence and limited resource constraints. The effectiveness of the proposed evolutionary strategy is compared with some standard problems and finally, a real-life EPC project scheduling problem of a petroleum refinery is illustrated.

Keywords: EPC; engineering procurement construction; project scheduling; GAs; genetic algorithms; DSS; decision support systems; resource constraints; construction projects; minimum makespan; petroleum refineries. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.inderscience.com/link.php?id=41372 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:8:y:2011:i:2:p:251-269

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:8:y:2011:i:2:p:251-269