EconPapers    
Economics at your fingertips  
 

Optimising coordinated multi-team volunteer scheduling: a combined constraint programming and goal programming approach

Christopher Garcia and Ghaith Rabadi

International Journal of Industrial and Systems Engineering, 2011, vol. 9, issue 2, 183-194

Abstract: Volunteer scheduling is often more difficult than other types of labour scheduling because the non-compulsory nature of such work requires organisations to respect many more preferences and constraints. Furthermore, there is very little existing research in this type of scheduling. In this paper, we describe a software system based on constraint programming (CP) and goal programming (GP) we developed to enable a volunteer-run church to schedule its weekly operations. Multiple volunteer teams operate each week within this organisation, and each team has a required number of weekly volunteers. Each team has its own scheduling objective: either to maximise the amount of time each worker has off or to maximise worker participation. Conflicts between jobs and workers must also be prevented in addition to respecting several types of worker preferences. We develop a CP–GP approach for solving this problem and discuss the computational results obtained.

Keywords: volunteer scheduling; constraint programming; goal programming; multi-objective optimisation; volunteer teams; volunteers; volunteering. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.inderscience.com/link.php?id=42834 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:9:y:2011:i:2:p:183-194

Access Statistics for this article

More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijisen:v:9:y:2011:i:2:p:183-194