Assessing solution methods to mixed multi-objectives scheduling problems
E.O. Oyetunji
International Journal of Industrial and Systems Engineering, 2011, vol. 9, issue 2, 213-226
Abstract:
This paper considers the scheduling problem of optimising multiple criteria (multi-objectives) at a time. The technique proposed earlier on for assessing the performance of solution methods to bicriteria problem is extended to multi-objectives scheduling problems. Unlike before, the composite objective function (COF) is designed to handle situations in which some of the criteria are to be minimised while some are to be maximised (mixed multi-objectives). The normalisation procedure proposed earlier on is also modified to yield a dimensionless (scalar) COF. Two illustrative examples were used to demonstrate the utility of the techniques being proposed for assessing the performance of solution methods to mixed multi-objectives scheduling problems.
Keywords: multi-objective scheduling; dimensionless function; composite objective function; normalisation; multiple criteria. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=42836 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:9:y:2011:i:2:p:213-226
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().