Modified Johnson rule for two-stage flowshop scheduling with random breakdowns
Fawaz Abdulmalek
International Journal of Logistics Systems and Management, 2019, vol. 33, issue 4, 591-600
Abstract:
The two-stage flowshop assembly scheduling problem where there are m machines at the first stage and an assembly machine at the second stage is considered in this paper. In several real world service and production systems, there is more than one parallel machine at stage one and an assembly machine to assemble job components at stage two. The machines at stage one will be subjected to unsystematic breakdowns. The jobs order sequence into the flowshop will be based on three jobs ranking rules, Johnson rule, and two modified Johnson rule, namely Johnson largest rule and Johnson smallest rule. A simulation model of the two-machine flowshop then will be constructed in which both machines at stage one are subject to random failures. Three simulation experiments will be conducted to examine the effect of the job ranking rules on the makespan. The result showed that Johnson largest ranking rule gave the minimum makespan over the others.
Keywords: flowshop scheduling; random breakdowns; Johnson rule; simulation. (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=101791 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijlsma:v:33:y:2019:i:4:p:591-600
Access Statistics for this article
More articles in International Journal of Logistics Systems and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().