Scheduling of multiple projects with resource transfers
M.L. Mittal and
Arun Kanda
International Journal of Mathematics in Operational Research, 2009, vol. 1, issue 3, 303-325
Abstract:
In organisations, dealing with projects, multiple projects are run simultaneously sharing a common pool of resources. The resources in such a multi-project environment are generally transferred between the projects, consuming significant amounts of both time and cost. In most of the existing models for multi-project planning and scheduling, however, these transfers are implicitly assumed to occur instantaneously with no extra cost. This assumption of instantaneous resource transfers, in most of the practical situations, is not valid and thus may lead to unrealistic schedules. This article is aimed at modelling of these transfers of resources in multi-project scheduling. A generalised model for inter-project resource transfers is presented and an integer linear program is proposed for minimising the penalty/reward for tardy/early projects, and the cost of idleness and transfer of the resources. A heuristic procedure is also developed and computational results are reported.
Keywords: multi-project scheduling; resource constraints; resource transfers; multiple projects; resource sharing; project planning. (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.inderscience.com/link.php?id=24288 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmore:v:1:y:2009:i:3:p:303-325
Access Statistics for this article
More articles in International Journal of Mathematics in Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().