EconPapers    
Economics at your fingertips  
 

An integrated cost model for production scheduling and perfect maintenance

Laith A. Hadidi, Umar M. Al-Turki and M. Abdur Rahim

International Journal of Mathematics in Operational Research, 2011, vol. 3, issue 4, 395-413

Abstract: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.

Keywords: production scheduling; preventive maintenance; deteriorating production processes; integrated models; unreliable machine; cost models; job sequencing. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.inderscience.com/link.php?id=40875 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmore:v:3:y:2011:i:4:p:395-413

Access Statistics for this article

More articles in International Journal of Mathematics in Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijmore:v:3:y:2011:i:4:p:395-413