Scheduling to minimise penalties for a non-dedicated supplier in integrated supply chains
Anurag Agarwal and
Vaidyanathan Jayaraman
International Journal of Manufacturing Technology and Management, 2010, vol. 19, issue 1/2, 68-81
Abstract:
We consider a scheduling problem faced by a supplier in an integrated supply-chain relationship simultaneously with two or more customers. Each customer demands multiple lots of products to be delivered each day. Late deliveries are subject to penalties. The supplier's problem is to schedule the day's production, given fixed resources, to minimise the penalties. We propose three heuristics – Earliest Delivery Time Next (EDT), Earliest Loading Time Next (ELT) and Penalty-Based Improvement (PBI) heuristic. Empirical results show that PBI heuristic performs significantly better than the other two heuristics, saving as much as 53% compared to EDT heuristic.
Keywords: supplier scheduling; supply chain integration; mathematical modelling; heuristics; supply chain management; SCM. (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=29451 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmtma:v:19:y:2010:i:1/2:p:68-81
Access Statistics for this article
More articles in International Journal of Manufacturing Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().