A bottleneck-based due-date assignment methodology
Yu-Jen Chang, Ching-En Lee
International Journal of Manufacturing Technology and Management, 2000, vol. 1, issue 2/3, 318-327
Abstract:
On-time delivery is one of the most important performance criteria in today's manufacturing systems. To enhance delivery performance, the appropriate assignment of an order's due-date is necessary. In recent years, many due-date setting methods based on regression analysis models have been proposed. Although some of them emphasise the use of shop floor information in due-date setting, the bottleneck scheduling information has not yet been taken into consideration by those methods. It is the objective of this paper to propose a new due-date assignment method based on bottleneck scheduling information. To assign an order's due-date, this proposed method first optimises the job sequence at the bottleneck using a Tabu search algorithm and then predicts the order's flow time after its completion of its bottleneck operation. Experimental results show that the proposed method can greatly enhance the delivery performance.
Keywords: bottleneck; due-date assignment; on-time delivery; Tabu search. (search for similar items in EconPapers)
Date: 2000
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=1336 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmtma:v:1:y:2000:i:2/3:p:318-327
Access Statistics for this article
More articles in International Journal of Manufacturing Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().